Friday, May 29, 2009

Asparagus

As much as I love the wheat color, we need more color. At first I was thinking a dark brown accent wall, but was gently reminded that it's a basement. We don't need any "cave like" colors.
The plan is to continue the green into the bedroom. I can almost see the light at the end of the tunnel...almost.

Wednesday, May 27, 2009

Deadlines

We knew that the carpet was coming today, so Michael and I stayed up last night and tried to get as much done on the built-ins as we could. I primed the bottom edge so that I wouldn't have to paint next to the carpet. Michael worked on the trim detail. I keep looking at it and imagining it painted. If I keep imagining enough, will it paint itself?!
The tack strip got mostly installed today and the carpet pad installed. Tomorrow is the big day for carpet.

Tuesday, May 26, 2009

"Almost" Completed Bathroom

We missed a step in the communication department and the finish plumbing got done today. We would like to put up beadboard in the bathroom...eventually. The tile was also finished. Now we just need to save our pennies and get a shower door.

Monday, May 25, 2009

Shopping

We went ahead and started looking for a couch today. We know that we're getting carpet on Wednesday and Thursday and we'd like to be able to sit down on something once the carpet is in. That's the last big thing that needs to be done. Of course there's a laundry list of little things that need to be touched up (oh and painting the bedroom).

Wednesday, May 20, 2009

Tile

Originally we planned on random blue tiles on the floor. A geometric pattern won out in the end. So, the plan is to get the the rest of the tiles done tomorrow and hopefully grout as well.
*Can you find the missing blue tile? I didn't notice it until I took the picture. Guess I better remember to tell the guy tomorrow.

Tuesday, May 19, 2009

Hurry Up and Wait

Michael needed to get the carcass of the "entertainment" shelves done before the carpet is installed. I think the carpet is coming next week.I needed to paint the bathroom before the tile gets installed. I should have painted before the electrician installed the lights...oh well. I believe the tile guy is coming today. (fingers crossed)
The rest of the stairwell got painted...who wants to help me remove the blue tape?

Monday, May 11, 2009

Paint

We're in the homestretch with the basement. It's crunch time for the budget and I had to made an economical decision regarding the paint. I already had a 5 gallon container of the "wheat" color from the rest of the house that I'm in the process of painting. Since I had the paint, I went ahead and used what I had instead of investing another $125 in more paint.

We started painting Saturday night. I was able to tape and caulk the bulk of the room. I happy to report that the bulk of the room is painted. I still need to go up the stairs with the paint and tape off the soffits.


Thursday, May 7, 2009

Pregnant Pause

Getting the basement done is like being pregnant. It goes really slow when you're the one having the baby, but if it's someone else, it goes by quick. It's been just over a month since we started, but it feels much longer for me.
This picture probably has the most bang for our buck as far as trim work goes. All the doors were hung and trim around the windows, doors, and floors got installed. The closet got a couple shelves and the sump pump has a hinged lid to cover it. (That's under the few shelves in the corner).

The next step is getting the trim work painted, that's happening tomorrow. I believe that the tile is going to be installed next week.

Friday, May 1, 2009

Shopping Made Easy

Michael and I went to the carpet/tile store to pick out tile for the basement bathroom. We had budgeted for the $2 tile, but I wasn't excited by the choices of beige. Instead we chose white subway tile for the shower and hexagon tiles for the floor. I think we were in and out of the store in 30 minutes. Easy peasy Parcheesi.

*This is not our bathroom!* Just a general idea of what we're going for. The subway tile is going in the shower. The liner (accent) tile is the same flower/leaf design but in a cobalt blue.

Wednesday, April 29, 2009

Texture

After a much promising lead by the mud guy, the texture got delayed until today. I'm excited to see the texture on the walls, one more step to being finished.

Wednesday, April 22, 2009

Been a While

As you can see, my last post was Friday. That was the day that Michael came home from his 10 day trip. Needless to say, I exhaled a big sigh of relief when his plane landed. Life has gotten back to normal...as normal as it is around here.

Let's see, what has happened since Friday? I know everyone is waiting with baited (is that the right spelling?) breath on the basement update. They finished the drywall Tuesday and started taping and mudding today. I think that texture is tomorrow. The next step will be painting...I need to get mentally prepared to tackle that job.

Friday, April 17, 2009

Drywall

Beautiful drywall. It's about a third of the way completed. Optimistically this will take a week and a half.

Wednesday, April 15, 2009

Padded Walls

We had the insulation installed today. It was already on the walls, we figured that we needed as much sound barrier between the basement and upstairs.
The bathroom with the shower pan installed.

Friday, April 10, 2009

Movin Right Along

The framing got finished yesterday and the plumbing got started. Today the electrician put in the cans for the lights and started running wires.
The plumbers put in the shower pan and got pipes ready. We decided to go with tile in the shower, thankfully we don't have to pick that for a little while.

The Devil Is In the Details

Today the plumber and the electrician had a few questions. I was making decisions right and left. There are a lot of details I'm not particular about or others that I angst about.

I needed to pick out a fan/light for the bathroom. I picked one and as soon as I walked out the door at Lowes I knew it was the wrong choice. I walked right back in and exchanged it for the one on the left. Much prettier.

It's nice to have choices, but sometimes there are too many choices.

Wednesday, April 8, 2009

Demo

There was a little bit of demo today. The wall got cut out to have a more "open" feel as you go down the stairs.The soffit to cover all the duct work is nearly completed. I think the framing will be done tomorrow.

Monday, April 6, 2009

Projectpalooza

More projects than you can shake a stick at.

The basement is humming right along. The plumbers should be here tomorrow and I should hear some jackhammering. The framing is coming along, it should be done by Wednesday. I think that the electrician will be here on Thursday.
The laundry/spa gained more bead board over the weekend. It did add more painting, thankfully Michael bought the PRE-primed sheet which made the job easier.
I have some art commissioned by Emma that I have framed...I think it will be rotating art. I still need a few things to add to the room, but it's getting there.

Saturday, April 4, 2009

Basement Progress

I will just do a quick update as to what has gotten done since Wednesday.

Thursday, the "green boards" got laid down. This is the wood that was nailed into the cement and is the base for all the walls.
Friday; The bathroom is framed and the closet in the bedroom. The bathroom is very small and the closet is huge.
Saturday; The bedroom/office is framed.
Looking at the family room, the storage area is behind the plastic sheeting on the right.
Still to come. Finish framing the family room and the soffits.

Wednesday, April 1, 2009

Michael Got Wood

The delivery truck with the wood arrived early this morning. I know that you (the general masses that follow this obscure blog) will get sick of the posts that are basement related, but we're in the honeymoon phase of construction. Ok, we haven't even started construction, but we're close.
This is the basement with all the wood that was once outside.
Look at the pretty blue chalk lines.

Saturday, March 28, 2009

The Basement Clean Up

And so it begins....We signed a contract to start construction on the basement. We just need to clean up the basement and construction will start next week. By cleaning up the basement...we essentially needed to move EVERYTHING. This included the storage shelves that Michael built, with all the stuff already on it. Michael has a huge workbench that also needed to get moved, I wasn't looking forward to that.We did get everything moved. We are going to have to move the cat's paraphernalia again. Moving it is not as easy as one would expect. Anyone want a cat for the next couple months?